The setup process involves defining the structure of the work in a top-down manner:
2.5.1 Program Setup¶
This is the highest level of the hierarchy.
- Action: Define the overarching programs (e.g., "Spring 2025 Incubation Cohort," "Global Accelerator").
- Purpose: To group related projects and provide a high-level view of strategic initiatives.
2.5.2 Project Setup¶
Projects are the main components within a program.
- Action: Define individual projects (e.g., "Startup Onboarding Project," "Mentor Matching Initiative").
- Purpose: To manage a specific set of deliverables within the program scope.
2.5.3 Outcome Setup¶
Outcomes define the desired results of a project.
- Action: Define the measurable results expected from the completion of a project (e.g., "10 Startups Successfully Graduated," "50% Increase in Mentor Engagement").
- Purpose: To ensure that all work is goal-oriented and measurable.
2.5.4 Activity Setup¶
Activities are the high-level actions required to achieve the defined outcomes.
- Action: Define the major steps or phases within a project (e.g., "Application Review Phase," "Mentorship Sessions").
- Purpose: To break down the project into manageable stages.
2.5.5 Sub-Activity Setup¶
Sub-activities are the most granular level of the PMO structure, representing specific tasks.
- Action: Define the specific tasks and steps within each activity (e.g., "Review Application Form 1," "Schedule First Mentor Meeting").
- Purpose: To provide clear, actionable steps for team members and track progress at a detailed level.